Uploaded image for project: 'OpenShift Pipelines'
  1. OpenShift Pipelines
  2. SRVKP-3588

ReportPortal: Train the tool - Pipelines

    XMLWordPrintable

Details

    • Pipelines Sprint 251, Pipelines Sprint 252, Pipelines Sprint 253, Pipelines Sprint 254, Pipelines Sprint 255

    Description

      Post onboarding the ReportPortal tool, train the tool manually so that the tool can identify and classify CI failures by itself.

      The issues are to be classified into the following three categories:

      1. Regression - aka issue introduced by the PR
      2. Flake - aka unstable test that fails randomly
      3. Infra issue - test failure due to any infra instability

      Acceptance Criteria:

      1) Each CI failure is evaluated and entry marked in the RP tool. This needs to happen for a longer period of time (3 months) to train the RP tool model

      2) The RP tool can identify and classify the CI failures by itself.

      Attachments

        Issue Links

          Activity

            People

              varadhya Veeresh Aradhya
              rgarg-1 Ruchir Garg
              Votes:
              0 Vote for this issue
              Watchers:
              3 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved: