-
Story
-
Resolution: Done
-
Normal
-
None
-
None
-
None
-
3
-
False
-
False
-
Undefined
-
-
Pipelines Sprint 205
Description
As a user, when looking at my pipeline metrics, canceled pipelines should not be reported as failed.
Whether we should report that canceled should be included as a separate status, or more likely ignored still needs to be determined.
Acceptance Criteria
1. Additional tag `cancelled` exits in Tekon Pipeline Metrics
- is related to
-
RFE-2444 Pipeline Metrics includes canceled pipelines as failed
- Accepted