Uploaded image for project: 'OpenShift Specialist Platform Team'
  1. OpenShift Specialist Platform Team
  2. SPLAT-2436

pre-merge testing: vSphere 7.x deprecation and removal validation

    • Icon: Story Story
    • Resolution: Unresolved
    • Icon: Normal Normal
    • None
    • None
    • None
    • None
    • None

      User Story

      As an OpenShift developer, I want pre-merge testing for vSphere 7.x deprecation and removal features so that we can catch regressions before they reach the main branch.

      Description

      Implement pre-merge testing to ensure that changes to the vSphere 7.x deprecation and blocking functionality don't introduce regressions or break the intended behavior.

      Acceptance Criteria

      Pre-merge Test Implementation

      • [ ] Create fast pre-merge tests for vSphere version detection logic
      • [ ] Implement tests for deprecation warning display and formatting
      • [ ] Create tests for installation blocking functionality
      • [ ] Test error message generation and content validation
      • [ ] Implement tests for upgrade blocking scenarios

      Test Optimization

      • [ ] Optimize test execution time for developer workflow integration
      • [ ] Create mock/stub implementations for faster version detection testing
      • [ ] Implement parallel test execution where possible
      • [ ] Focus on high-value test scenarios for pre-merge validation
      • [ ] Balance comprehensive coverage with execution speed

      Integration with Development Workflow

      • [ ] Integrate vSphere 7.x tests into PR validation process
      • [ ] Ensure test failures block merging of related changes
      • [ ] Provide clear feedback to developers on test failures
      • [ ] Create test selection logic based on code change impact
      • [ ] Implement retry mechanisms for transient test failures

      Test Coverage Strategy

      • [ ] Cover core functionality changes in pre-merge testing
      • [ ] Test version detection edge cases and error handling
      • [ ] Validate message formatting and content requirements
      • [ ] Test integration points with installer and upgrade logic
      • [ ] Cover backwards compatibility scenarios during transition

      Developer Experience

      • [ ] Ensure test feedback is timely and actionable
      • [ ] Provide clear documentation for running tests locally
      • [ ] Create debugging guidance for test failures
      • [ ] Minimize false positive rate for vSphere 7.x tests
      • [ ] Optimize resource usage for sustainable test execution

      Definition of Done

      • Pre-merge testing covers all critical vSphere 7.x deprecation functionality
      • Tests provide fast feedback to developers without blocking productivity
      • Test reliability meets developer team expectations
      • Integration with PR workflow is seamless and effective

              Unassigned Unassigned
              rhn-support-rvanderp Richard Vanderpool
              None
              None
              None
              None
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated: