-
Epic
-
Resolution: Done
-
Critical
-
None
-
None
-
[OCI] Execute the one-off e2e validation of Assisted Installer installation
-
BU Product Work
-
11
-
False
-
None
-
False
-
Not Selected
-
To Do
-
OCPSTRAT-1203 - [GA] OpenShift on Oracle Cloud Infrastructure (OCI) Bare metal
-
OCPSTRAT-1203[GA] OpenShift on Oracle Cloud Infrastructure (OCI) Bare metal
-
0% To Do, 0% In Progress, 100% Done
-
OpenShift SPLAT - Sprint 259
Epic Goal
- Validate the Assisted Installer documentation to deploy OpenShift on Oracle Cloud (OCI) VMs and BMs, targetting mixed environments in a single workflow.
- Feed Documentation team targeting the 4.17 release
- Collect action items to review the CI jobs using OCI automation (terraform)
References:
- The scope of validation (e2e test case): manually deploy OCP on OCI with platform type External using Assisted Installer SaaS
- The mixed topology to test: Control Plane in VMs, Worker nodes using Bare Metal instances
- The documentation references to review, Oracle and RH:
- Red Hat: https://docs.openshift.com/container-platform/4.16/installing/installing_oci/installing-oci-assisted-installer.html
- Oracle: https://docs.oracle.com/pt-br/iaas/Content/openshift-on-oci/overview.htm
- Oracle deployment config version (beta-v1): https://github.com/oracle-quickstart/oci-openshift/tree/beta-v1
- The feedback channel to feed the Documentation team: Google docs will be created, or a fork of openshift-docs - depending of the amount of suggestions - which one that would be more collaborative
- The feedback channel to feed the Oracle team while reviewing the Terraform code: Joint Slack channel ext-redhat-oracle-offerings
- Release to be used: Latest 4.17 available in AI: 4.17-rc.1
Why is this important?
- Oracle GA for VMs and BMs with X86_64 and ARM64 in Oct, 2024
Scenarios
- manually deploy OCP on OCI with platform type External using Assisted Installer SaaS
Acceptance Criteria
- CI - MUST be running successfully with tests automated
- Release Technical Enablement - Provide necessary release enablement details and documents.
- ...
Dependencies (internal and external)
- ...
Previous Work (Optional):
- …
Open questions::
- …
Done Checklist
- CI - CI is running, tests are automated and merged.
- Release Enablement <link to Feature Enablement Presentation>
- DEV - Upstream code and tests merged: <link to meaningful PR or GitHub Issue>
- DEV - Upstream documentation merged: <link to meaningful PR or GitHub Issue>
- DEV - Downstream build attached to advisory: <link to errata>
- QE - Test plans in Polarion: <link or reference to Polarion>
- QE - Automated tests merged: <link or reference to automated tests>
- DOC - Downstream documentation merged: <link to meaningful PR>