• Icon: Epic Epic
    • Resolution: Unresolved
    • Icon: Undefined Undefined
    • None
    • None
    • None
    • None
    • Enable ML-KEM (Post-Quantum) Support in ACS
    • False
    • Hide

      None

      Show
      None
    • False
    • ROX-31576[ENG] Migration of Red Hat Operator Base Images to UBI 9 Minimal Variants
    • Not Selected
    • In Progress
    • ROX-31576 - [ENG] Migration of Red Hat Operator Base Images to UBI 9 Minimal Variants
    • 50% To Do, 50% In Progress, 0% Done
    • Hide

      17.02.2026

      • split from the ROX-32095 epic
      • trying to enable PQC key exchange in one of the Postgres images

      24.02.2026

      • PostgreSQL only supports PQC key exchange starting from v18 (we are on v15)
      • upstream has no plans to backport this to older versions
      • options going forward: upgrade DBs to v18 and obtain an exception until that is done; investigate possibility of a proxy sidecar
      Show
      17.02.2026 split from the ROX-32095 epic trying to enable PQC key exchange in one of the Postgres images 24.02.2026 PostgreSQL only supports PQC key exchange starting from v18 (we are on v15) upstream has no plans to backport this to older versions options going forward: upgrade DBs to v18 and obtain an exception until that is done; investigate possibility of a proxy sidecar

      Overview:

      A high level summary that describes the Epic in a clear, concise way. Complete during New status.

      Enable ML-KEM (X25519MLKEM768) key encapsulation for ACS TLS servers to meet OCP 4.22 PQC requirements.

      Requirements:

      A list of specific needs or objectives that an epic must deliver in order to be considered complete. Be sure to include nonfunctional requirements such as security, reliability, performance, maintainability, scalability, usability, etc. Initial completion during Refinement status.

      <enter general Epic requirements here>

      Technical Scope:

      High-level list of items that are in scope; usually completed by a staff engineer or a lead from the Feature Delivery Team. Initial completion during Refinement status.

      <your text here>

      Out of Scope:

      High-level list of items that are out of scope. Initial completion during Refinement status.

      <your text here>

      Outstanding Questions (Optional):

      Include a list of refinement / architectural questions that may need to be answered before coding can begin. Initial completion during Refinement status.

      <your text here>

              rh-ee-vbologa Vlad Bologa
              rh-ee-vbologa Vlad Bologa
              ACS Install
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated: