-
Outcome
-
Resolution: Unresolved
-
Undefined
-
None
-
None
-
None
-
None
-
0% To Do, 100% In Progress, 0% Done
-
Not Selected
-
0
Outcome Overview
This outcome will deliver a validated, documented, and officially supported Backup & Restore (B&R) solution for Red Hat OpenStack on OpenShift (RHOSO) that achieves parity with the system-level B&R capabilities provided in Red Hat OpenStack Platform (RHOSP) 17.1.
This incremental movement enables RHOSO to be used in production environments where B&R is a mandatory operational requirement. By leaning into existing OpenShift B&R products, we reduce engineering effort and streamline the operational experience for customers already familiar with OpenShift B&R practices, thereby accelerating customer adoption and migration from RHOSP to RHOSO.
Success Criteria
For this outcome to be considered delivered, the following must be true:
- A supported B&R process exists for RHOSO that successfully captures and restores the equivalent of the RHOSP 17.1 Undercloud, Control Plane hosts, and OpenStack Database: RHOSO control plane and OpenStack databases.
- The B&R solution exclusively utilizes OpenShift's native B&R capabilities and/or supported OpenShift B&R products (e.g., OADP/Velero, etc.) to perform the required system backup.
- The restored RHOSO deployment is fully functional, stable, and ready to accept tenant workloads without manual intervention beyond the documented restore process.
- Official, customer-facing documentation is published that details the necessary steps for system backup and full system recovery for RHOSO.
Expected Results (what, how, when)
- Unblock Production Sales/Adoption: The availability of a supported B&R solution removes a key blocker for customers requiring an operational recovery plan for their OpenStack control plane.
- Operational Efficiency: Leveraging OpenShift's B&R capabilities results in a more efficient and standard operational workflow for customers already managing OpenShift clusters.
- Technical Validation & Reliability: Successful validation ensures the solution is robust and meets the operational requirements of a production environment.
Post Completion Review – Actual Results
After completing the work (as determined by the "when" in Expected Results above), list the actual results observed / measured during Post Completion review(s).