-
Story
-
Resolution: Unresolved
-
Normal
-
None
-
None
-
None
-
False
-
-
False
-
-
Feature description
As of now when user goes to Pipelines > Runs page of Dashoard they will likely switch between Scheduled and Triggered, based on their usage of the feature.
I think it would give a smoother experience having all the runs listed as soon as user reaches the Runs page. Some options I could think of:
- merge scheduled and triggered runs in the same list and labeled in a way to be distinguished easily (filters would be great help) -> possible issue: handle different attributes in the same table
- move the scheduled run to a dedicated page