-
Task
-
Resolution: Done
-
Blocker
-
None
-
None
Task to release 1.2.5
Release tasks include (but are not limited to):
collect the fixes in janus plugins + community plugins, and verifying that they've been released to npmjs.com
collect the updated plugin versions into showcase, and verifying a downstream build has succeeded
add builds to the errata
validate CVP test results have all passed - https://errata.engineering.redhat.com/advisory/140058/test_run/greenwave_cvp
push errata to stage - https://errata.engineering.redhat.com/push/push_history_for_errata/140058
coordinate with QE and Doc via slack and email notifications of RC builds and progress of testing, doc readiness, etc. - sent last RC on 11/06
TODO:
remind QE to move the errata to {{REL_PREP; }}watch while the builds are pushed (1-2 hrs?); complain on slack in various rel-eng channels if things break while pushing or ask siege for help
generate the helm chart PR for the openshift helm charts repo; monitor until it's merged
smoke test the operator and helm installs
TODO on GA day:
notify Docs that they can release the latest RN updates
tag the repos w/ the new 1.2.5 tag; bumping the repos to 1.2.6 in case we do another z update
update the RELEASE_GUIDE.adoc with any new processes/fixes