Uploaded image for project: 'Red Hat Internal Developer Platform'
  1. Red Hat Internal Developer Platform
  2. RHIDP-10265

API to load all available session for a particular user

    • Icon: Story Story
    • Resolution: Done
    • Icon: Major Major
    • None
    • None
    • None
    • DEVAI Sprint 3264, DEVAI Sprint 3265

      Story (Required)

      API to load all available session for a particular user

      see design doc for /session/list: https://docs.google.com/document/d/1nzW-crxBZoayWDWlZbtk0q6bmWFPy9qJ8Yun_zNOvRk/edit#heading=h.mlj24ije6zf0

       

      will need to verify userid passed in with the login user & token, the function will be done as part of: https://issues.redhat.com/browse/DEVAI-45

       

      tests is also included as part of this issue

      Background (Required)

      <Describes the context or background related to this story>

      at least requires https://issues.redhat.com/browse/DEVAI-46 to be done

      Out of scope

      <Defines what is not included in this story>

      Approach (Required)

      <Description of the general technical path on how to achieve the goal of the story. Include details like json schema, class definitions>

      Dependencies

      <Describes what this story depends on. Dependent Stories and EPICs should be linked to the story.>

      Acceptance Criteria (Required)

      <Describe edge cases to consider when implementing the story and defining tests>

      <Provides a required and minimum list of acceptance tests for this story. More is expected as the engineer implements this story>

      documentation updates (design docs, release notes etc)
      demo needed
      SOP required
      education module update (Filled by DEVHAS team only)
      R&D label required (Filled by DEVHAS team only)

      Done Checklist

      Code is completed, reviewed, documented and checked in
      Unit and integration test automation have been delivered and running cleanly in continuous integration/staging/canary environment
      Continuous Delivery pipeline(s) is able to proceed with new code included
      Customer facing documentation, API docs, design docs etc. are produced/updated, reviewed and published
      Acceptance criteria are met
      If the Grafana dashboard is updated, ensure the corresponding SOP is updated as well

              yangcao Stephanie Cao
              yangcao Stephanie Cao
              RHIDP - AI
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated:
                Resolved: