Uploaded image for project: 'Red Hat Internal Developer Platform'
  1. Red Hat Internal Developer Platform
  2. RHIDP-10061

Add support for the 3scale plugin to the RHDH AI installer

    • Icon: Story Story
    • Resolution: Unresolved
    • Icon: Normal Normal
    • None
    • None
    • None
    • 5
    • False
    • Hide

      None

      Show
      None
    • False

      Story (Required)

      As an engineer working on AI Applications I want to be able to integrate my 3Scale instance with my RHDH AI installation.

      In order to achieve that the RHDH AI installer needs to be able to enable the 3scale RHDH Plugin if specific flags are provided to the installer.

      Background (Required)

      After the investigation made for https://issues.redhat.com/browse/DEVAI-87 we can now proceed with the implementation of the support of the 3scale RHDH plugin.

      As mentioned inside the investigation issue more information can be found here: https://docs.google.com/document/u/2/d/1g0niHaMYAhhDZpbPncnr5ZvDhJnE6T-qN3CTkBOnY9o/edit

      Out of scope

      Things that don't have to do with the enablement of the 3scale plugin.

      Approach (Required)

      We can add some flags to the RHDH installer where the user can provide the `baseUrl` and the `access_token` for their 3scale installation. If those values exist the installer should try to enable the 3scale plugin and the content of the APIs should be synced with their 3scale instance. As a result the user should be able to see all APIs registered on the 3scale side.

      Dependencies

      <Describes what this story depends on. Dependent Stories and EPICs should be linked to the story.>

      Acceptance Criteria (Required)

      <Describe edge cases to consider when implementing the story and defining tests>

      <Provides a required and minimum list of acceptance tests for this story. More is expected as the engineer implements this story>

      documentation updates (design docs, release notes etc)
      demo needed
      SOP required
      education module update (Filled by DEVHAS team only)
      R&D label required (Filled by DEVHAS team only)

      Done Checklist

      Code is completed, reviewed, documented and checked in
      Unit and integration test automation have been delivered and running cleanly in continuous integration/staging/canary environment
      Continuous Delivery pipeline(s) is able to proceed with new code included
      Customer facing documentation, API docs, design docs etc. are produced/updated, reviewed and published
      Acceptance criteria are met
      If the Grafana dashboard is updated, ensure the corresponding SOP is updated as well

              Unassigned Unassigned
              rh-ee-tpetkos Theofanis Petkos
              RHIDP - AI
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated: