-
Task
-
Resolution: Done
-
Minor
-
None
-
None
-
False
-
False
-
-
1
-
Testable
I was not sure what "No changes needed" means (changes to do by the tool or myself?).
IMHO "No action required" is clearer.
Acceptance criteria:
- the post-conversion analysis summary "No changes needed" is replaced with "No action required"