Uploaded image for project: 'RHEL'
  1. RHEL
  2. RHEL-1403

[NMCI] dracut_NM_team_over_2_ifaces is unstable

Linking RHIVOS CVEs to...Migration: Automation ...Sync from "Extern...XMLWordPrintable

    • None
    • None
    • rhel-net-mgmt
    • ssg_networking
    • None
    • False
    • False
    • Hide

      None

      Show
      None
    • None
    • None
    • None
    • None
    • If docs needed, set a value
    • None
    • 0

      Description of problem:
      Sometimes the test hangs at switch root phase. The problem seems to be killing teamd and that detaches the ports. Might be related to systemd or libteam, needs deeper investigation.

      Version-Release number of selected component (if applicable):
      1.43.7-32262.copr.fc0fc4ab0d.el9

      How reproducible:
      10% of the cases

      Steps to Reproduce:
      1. run the aforementioned test dracut_NM_team_over_2_ifaces

      Actual results:
      Test fails in around 10% of the runs, hang during Switchroot phase.

      Expected results:
      Test should be reliable

      Additional info:
      https://desktopqe-jenkins.rhev-ci-vms.eng.rdu2.redhat.com/job/beaker-NetworkManager-main-veth-rhel9-upstream/2329/artifact/artifacts/FAIL_report_NetworkManager-ci_Test0663_dracut_NM_team_over_2_ifaces.html (build marked to keep forever)

              nm-team Network Management Team
              rhn-support-fpokryvk Filip Pokryvka
              Network Management Team Network Management Team
              Vladimir Benes Vladimir Benes
              Votes:
              0 Vote for this issue
              Watchers:
              11 Start watching this issue

                Created:
                Updated:
                Resolved: