• Quality / Stability / Reliability
    • False
    • Hide

      None

      Show
      None
    • False
    • None
    • Unset

      The various tests in iqe-settings-plugin plugin need to be migrated to run in the PR pipeline for the most appropriate repositories. If needed, discuss the associated tests with the owners of the repository to determine where a given test belongs. 

      AC
      1. Tests migrated to TS/JS (Playwright). Running in-pipeline for given repositories.
      2. Any long-running tests should be noted, and, if-possible, set up for nightly execution using app-interface (spike needed to figure out the logistics of how this will work)
      3. Migrated tests should be documented (Priority, actions performed by the test, requirements tested). This can be done in something as simple as a README or markdown file for the tests.
      4. Once the tests have been migrated to the associated repos, they should be removed from the IQE plugin
      5. Tests should execute per-push in the designated repository. If the tests fail, it should impede merge.

      6. If there are any gaps identified during the migration process, open Jira items to represent the work of adding coverage. Link the created issues to this item for traceability (More > Link).

              Unassigned Unassigned
              btweed@redhat.com Brandon Tweed
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated: