Uploaded image for project: 'JBoss BPMS Platform'
  1. JBoss BPMS Platform
  2. RHBPMS-667

Designer does not allow add a Timer as boundary event to a task if they are within an embedded subprocess

XMLWordPrintable

    • Icon: Bug Bug
    • Resolution: Done
    • Icon: Critical Critical
    • None
    • 6.0.3
    • jBPM Designer

      If a timer is added as boundary event to a task which is in a subprocess, its bpmn2 tag is not changed from "bpmn2:intermediateCatchEvent" to "bpmn2:boundaryEvent", resulting in:

      "Timer node 'timer' has no outgoing connection."

      Steps to Reproduce:
      1. Drag and drop a timer to a user task in a embedded subprocess
      2. Save the process

      Actual results:
      The Problems tab show: ""Timer node 'timer' has no outgoing connection."
      " - in source code is generated an intermediateCatchEvent

      Expected results:
      No errors. The code generated should be "bpmn2:boundaryEvent"

              rhn-support-tsurdilo Tihomir Surdilovic (Inactive)
              rhn-support-alazarot Alessandro Lazarotti
              Sona Mala Sona Mala (Inactive)
              Sona Mala Sona Mala (Inactive)
              Kris Verlaenen, Marek Baluch, Rajesh Rajasekaran, Toshiya Kobayashi
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated:
                Resolved: