Uploaded image for project: 'JBoss BPMS Platform'
  1. JBoss BPMS Platform
  2. RHBPMS-4174

Not possible to copy previous version of an asset.

XMLWordPrintable

    • Hide

      1. Create new asset.
      2. Make some changes, save.
      3. Select previous version of the asset in the "Latest Version" dropdown.
      4. Copy and open the copied asset.

      Expected result: The copied asset contains the previous version of the original asset.
      Actual result: The copied asset contains the latest version of the original asset.

      Show
      1. Create new asset. 2. Make some changes, save. 3. Select previous version of the asset in the "Latest Version" dropdown. 4. Copy and open the copied asset. Expected result: The copied asset contains the previous version of the original asset. Actual result: The copied asset contains the latest version of the original asset.

      After changing to the previous version in "Latest Version" dropdown and copying the asset, the newly created asset contains the original latest version of the asset.

              trikkola Toni Rikkola
              jsoltes Juraj Soltes (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                Created:
                Updated:
                Resolved: