Uploaded image for project: 'JBoss BPMS Platform'
  1. JBoss BPMS Platform
  2. RHBPMS-2039

Connecting lines moved when resize swimlane in large process

XMLWordPrintable

    • Icon: Bug Bug
    • Resolution: Done
    • Icon: Major Major
    • 6.2.0
    • 6.1.0
    • jBPM Designer
    • None

      Description of problem:
      When you resize a swimlane in the attached BP, the connecting lines are moved, leading to a lot of layout work being undone.

      Version-Release number of selected component (if applicable):
      /bpmsuite-6.1.0.GA

      How reproducible:
      Happens in Chrome / Firefox / IE11

      Steps to Reproduce:
      1. Open attached BP
      2. Resize the orange swimlane at the bottom
      3. Notice that lots of lines which were carefully laid out have moved

      Additional info:
      See attached video and BP for testing.

              rhn-support-tsurdilo Tihomir Surdilovic (Inactive)
              jeremylindop_jira Jeremy Lindop (Inactive)
              Jozef Marko Jozef Marko (Inactive)
              Jozef Marko Jozef Marko (Inactive)
              Gary Hu
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated:
                Resolved: