-
Bug
-
Resolution: Won't Do
-
Minor
-
None
-
6.1.0
Description of problem:
Since bug 1170281 was fixed, the validator checks if the completion condition of an ad-hoc subprocess is not empty. After the validation is performed in the Designer, wrong node is highlighted as invalid.
Version-Release number of selected component (if applicable):
6.1.0 ER4
Steps to Reproduce:
1. Create a process with Start -> Ad-hoc subprocess -> End.
2. Run the validation.
3. See which node is highlighted.
Actual results:
Start node
Expected results:
Ad-hoc subprocess node