Uploaded image for project: 'JBoss BPMS Platform'
  1. JBoss BPMS Platform
  2. RHBPMS-169

Process elements divided in different swimlanes changes its connectors positions everytime we move one of the swimlanes

XMLWordPrintable

    • Icon: Bug Bug
    • Resolution: Done
    • Icon: Major Major
    • 6.2.0
    • 6.1.0
    • jBPM Designer
    • None

      Description of problem:

      If we have a gateway in Swimlane1 and it is connected to tasks on Swimlane2, all the time we chance Swimlane1 position or swimlane 2 position, the connectors position changes, making hard to check where its connection ends. (which node)

      Version-Release number of selected component (if applicable):
      n/a

      How reproducible:
      Always

      Steps to Reproduce:
      1. Create a process in a new project in BPM Suite 6.1
      2. add a start node that is connected to a task which is connect to a gateway
      3. Connect the gateway to tasks in another gateways and adjust the connector position (direction)

      Actual results:
      Every time we move the swimlane, it changes the connector position back to a default position

      Expected results:

      Do no change the position.

      Additional info:

      See attachments that demonstrate this issue.

              rhn-support-tsurdilo Tihomir Surdilovic (Inactive)
              rhn-support-wsiqueir William Siqueira
              Jozef Marko Jozef Marko (Inactive)
              Jozef Marko Jozef Marko (Inactive)
              Alessandro Lazarotti, Kris Verlaenen, William Siqueira
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated:
                Resolved: