Details
-
Feature Request
-
Resolution: Unresolved
-
Undefined
-
None
-
openshift-4.15
-
False
-
None
-
False
-
Not Selected
-
0
-
0%
Description
1. Proposed title of this feature request
Run descheduler in specific timeframes
2. What is the nature and description of the request?
It was requested to run the descheduler a s a job, but it was rejected in RFE-4971beacause it will be removed from upstream. Thus, opening this RFE to allow descheduler to work just on specific timeframes.
3. Why does the customer need this? (List the business requirements here)
Customer does not want drains to happen anytime, it would be nice to limit it to function only on off-peak time. This would avoid the descheduler from being run if the deschedulingIntervalSeconds parameter makes it run in on-peak time
4. List any affected packages or components.
Descheduler
Attachments
Issue Links
- is related to
-
RFE-4971 Run descheduler as a job
- Rejected