Uploaded image for project: 'OpenShift Request For Enhancement'
  1. OpenShift Request For Enhancement
  2. RFE-1503

Need a feature to pause the upgrade if fails and then continue if required.

XMLWordPrintable

    • Icon: Feature Request Feature Request
    • Resolution: Done
    • Icon: Minor Minor
    • None
    • None
    • None
    • False
    • False
    • 0
    • 0% 0%
    • Undefined

      Proposed title of this feature request:  Need a Feature to pause the upgrade before we reach the “point of no return” or ask for verification to continue post download and before rollout.

      Problem faced during the upgrade. CU wants to pause

            Unassigned Unassigned
            rhn-support-mbagga Mithilesh Bagga (Inactive)
            Votes:
            0 Vote for this issue
            Watchers:
            7 Start watching this issue

              Created:
              Updated:
              Resolved: