-
Bug
-
Resolution: Unresolved
-
Major
-
None
-
None
-
None
-
NEW
-
NEW
Given these entities with value range:
- Talk A, value range: [Timeslot 1, Timeslot 2, Timeslot 3]
- Talk B, value range: [Timeslot 1]
- Talk C, value range: []
then
- task B should be assigned to timeslot 1 before the phases start
- both task B and C should be ignored (= immovable) for the move selectors
- blocks
-
PLANNER-2183 Kogito Continuous Task Assignment in jBPM using OptaPlanner
- Resolved
- is duplicated by
-
PLANNER-175 Don't select from variables that only have one possible value
- Closed
- is related to
-
PLANNER-776 Real-time planning with daemon solving: starting with an empty VRP must be allowed to return an empty valueRange
- Resolved
- relates to
-
PLANNER-241 If all entities are immovable (or there are no entities), the solver should simply do nothing. It should not log bailing out warnings.
- Closed
-
RHBRMS-1726 When all next moves are not doable, optaplanner get stuck in step and if termination is not based on time, it cycles forever
- Closed