-
Story
-
Resolution: Unresolved
-
Major
-
None
-
None
Acceptance Criteria:
- test deploys a simple SMCP (in accordance with the blog post we published) and an Istio resource and then performs a revision-based upgrade to the latter
- user workload monitoring is configured
- SMCP version is 2.6 (2.5 is okay until 2.6 is ready)
- there should be no downtime. requests to workloads should work at all times
- upgrade failures are visible and reported to the team
- test runs against all versions of Istio we support in 3.0