Uploaded image for project: 'Red Hat OpenStack Services on OpenShift'
  1. Red Hat OpenStack Services on OpenShift
  2. OSPRH-26961

[WNTP] Upstream WNTP job fails over MTU/QoS tests after initial failure

XMLWordPrintable

    • Icon: Bug Bug
    • Resolution: Done
    • Icon: Critical Critical
    • None
    • None
    • internal
    • None
    • 3
    • False
    • Hide

      None

      Show
      None
    • False
    • ?
    • rhos-connectivity-neutron-quark
    • None
    • Neutron Quark 4
    • 1
    • Critical

      Certain failures [1] were noticed upstream by rodolfo_alonso in WNTP job, fails over QoS and other tests after initial failure.

      This task is to debug and resolve these issues.

      Setting high severity since suspected issue that fails all future tests after it (possible missing cleanup).

      [1]

      https://ba8dc0547d296ecb8252-f51718e85779029a4619d0950b3c25e3.ssl.cf5.rackcdn.com/openstack/49e96a221ee7412596b1fa177ec79fe8/testr_results.html

              rhn-support-mblue Maor Blaustein
              rhn-support-mblue Maor Blaustein
              rhos-dfg-networking-squad-neutron
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated:
                Resolved: