-
Spike
-
Resolution: Done
-
Major
-
None
-
None
-
None
-
2
-
False
-
-
False
-
rhos-connectivity-vans
-
-
-
VANS Sprint 33
-
1
-
Important
Summary:
- As part of Designate Operator multipool support, we should find a way to test the PR when it is applied on a RHOSO18 deployment with Designate enabled.
Goal:
- Find a way to apply the PR / code on a RHOSO18 host.