-
Story
-
Resolution: Unresolved
-
Major
-
None
-
None
-
None
-
False
-
-
False
-
Not Selected
-
rhos-conplat-core-operators
-
-
-
-
Core Operators Sprint 2026 4
-
1
Goal:
Validate the draft write-ups for the OSP 17.1 to RHOSO hardening transitions in the MAS Hardening Guide (CU Phase 1 Delta, Column I), so that the Documentation Team receives technically accurate, functional, and verified instructions.
Acceptance Criteria:
Highlight any missing steps, prerequisites, or deprecated features that were not accounted for in the initial draft write-up.
Attaching sample storage doc for providing input - https://docs.google.com/document/d/1Wm16u6sF9T516eaI6rxQfIXq4j0Zp_tYAtssTpLtsmk/edit?usp=sharing