Uploaded image for project: 'Red Hat OpenStack Services on OpenShift'
  1. Red Hat OpenStack Services on OpenShift
  2. OSPRH-15994

Update docs for ML2/OVN minimum bandwidth QoS

XMLWordPrintable

    • Icon: Epic Epic
    • Resolution: Done
    • Icon: Normal Normal
    • rhos-18.0.10 FR 3
    • rhos-18.0.10 FR 3
    • documentation
    • None
    • Update docs for ML2/OVN minimum bandwidth QoS
    • False
    • Hide

      None

      Show
      None
    • False
    • RHOSSTRAT-563Feature - ML2/OVN minimum bandwidth QoS (backend enforcement)
    • Not Selected
    • Proposed
    • Proposed
    • To Do
    • RHOSSTRAT-563 - Feature - ML2/OVN minimum bandwidth QoS (backend enforcement)
    • Proposed
    • Proposed

      Goal:

      Acceptance Criteria:

      Open questions:

      From doc planning template:

      • Is this feature fully supported or technical preview? 
      • Full support: Documentation will be published on the customer portal
      • Does the procedural content need to be tested by QE?
      • Does the doc epic need a release note in addition to the parent feature?
      • Yes - Writer fills in the Release Note Text and Release Note Type in the doc epic fields (not the engineering epic)
      • Are there any upstream or internal resources that the writer can use for planning and drafting the content?
      • Does the content require input from multiple DFGs?
      • No - Stories are not required unless the epic needs to be divided to user stories that can be delivered separately (for personal use, consider sub-tasks instead)
      • What type of information does the user need to know in order to use the feature?
      • Procedures to implement or enable the feature
      • Procedures to customize or configure the feature after installation
      • Procedures or considerations for upgrades, adoption, or minor updates
      • Procedures to verify that the feature is enabled and is working as expected
      • Procedures to operate or maintain the feature
      • Concepts that need to be explained or planning decisions that must be made before the user can perform any of these procedures
      • Permissions level required (RHOSO/OCP) or security considerations
      • Known issues, limitations, or troubleshooting guidance
      • Does the content need to be included in any of the following guides?
      •  
      • Planning guide: Are there prerequisites or planning decisions to add to the Planning guide? Maybe
      • SME: Rodolfo
      • QE: Bharath M V

              jamsmith@redhat.com James Smith
              mariel@redhat.com Mikey Ariel
              rhos-dfg-networking-squad-neutron
              Votes:
              0 Vote for this issue
              Watchers:
              3 Start watching this issue

                Created:
                Updated:
                Resolved: