-
Story
-
Resolution: Obsolete
-
Normal
-
None
-
None
-
10
-
False
-
False
-
rhos-workloads-compute
-
-
Goal:
- Adoption jobs based on CI framework adoption_osp_deploy (the Uni jobs as yet) need to able to configure and execute the data-plane-adoption test suite with multi-cell variables. (Currently the Uni jobs need to use FR2 branch of data-plane-adoption repo, they don't work with main branch.)
Acceptance Criteria:
- Adoption Uni job executed via CI framework configures the data-plane-adoption test suite correctly with new variables introduced as part of multi-cell work.
- The adoption workflow is executed successfully in this scenario.
- It deploys single cell topology in tripleo (osp17.1) to rhoso 18 (multicell only topologies are supported in rhoso, but it only provides cell1 here)
- What is not required: It is not necessary to make the Uni jobs deploy multiple cells as part of this story. They simply need to be able to keep working with the multi-cell-aware adoption test suite.
Further context:
- Multi-cell support was finished in https://github.com/openstack-k8s-operators/data-plane-adoption/pull/517
- There was a WIP patch here https://github.com/openstack-k8s-operators/ci-framework/pull/2740
- is depended on by
-
OSPRH-15520 Multi-cell adoption uni05epsilon job downstream
-
- In Progress
-
- links to