-
Epic
-
Resolution: Obsolete
-
Major
-
None
-
[Tech Preview] Include operator-controller OLMv1 MVP.1 in OCP payload
-
False
-
None
-
False
-
Not Selected
-
To Do
-
OCPSTRAT-199 - [Phase 1 MVP/Tech Preview] OLM 1.0 - Cluster-level Operator API (B1)
-
OCPSTRAT-199[Phase 1 MVP/Tech Preview] OLM 1.0 - Cluster-level Operator API (B1)
-
0% To Do, 0% In Progress, 100% Done
OCP/Telco Definition of Done
Epic Template descriptions and documentation.
<--- Cut-n-Paste the entire contents of this description into your new Epic --->
Epic Goal
- ...
Why is this important?
- …
Scenarios
- ...
Acceptance Criteria
- CI - MUST be running successfully with tests automated
- Release Technical Enablement - Provide necessary release enablement details and documents.
- ...
Dependencies (internal and external)
- ...
Previous Work (Optional):
- …
Open questions::
- …
Done Checklist
- CI - CI is running, tests are automated and merged.
- Release Enablement <link to Feature Enablement Presentation>
- DEV - Upstream code and tests merged: <link to meaningful PR or GitHub Issue>
- DEV - Upstream documentation merged: <link to meaningful PR or GitHub Issue>
- DEV - Downstream build attached to advisory: <link to errata>
- QE - Test plans in Polarion: <link or reference to Polarion>
- QE - Automated tests merged: <link or reference to automated tests>
- DOC - Downstream documentation merged: <link to meaningful PR>
- depends on
-
OPRUN-2939 [Tech Preview] Downstream builds for operator-controller OLMv1 MVP.1
- Closed
- is depended on by
-
OPRUN-2937 [Tech Preview] Downstream OLMv1 MVP.1 Demo
- Closed
1.
|
Pre-merge Testing | Closed | bruno andrade | ||
2.
|
Post-merge Testing | Closed | bruno andrade | ||
3.
|
E2E Automation | Closed | bruno andrade |