Uploaded image for project: 'Operator Runtime'
  1. Operator Runtime
  2. OPRUN-2796

First-pass end to end Deppy demo

XMLWordPrintable

    • Icon: Story Story
    • Resolution: Obsolete
    • Icon: Normal Normal
    • None
    • None
    • OLM 226 - Ratatouille

      As a Deppy developer I want to be able to integrate and test Deppy end to end so that I can ensure that all components can be integrated successfully.

      Summary / Background

      Acceptance Criteria

      • Integrate all components of Deppy (controller, solver, constraint builder and DeppySource)
      • Have a working end to end demo of Deppy

      Definition of Done

      • Integration tests (make target)
        • check that basic constraint work
        • figure out how to bootstrap integration tests (will need some sort of test data source)

              Unassigned Unassigned
              rh-ee-cchantse Catherine Chan-Tse
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated:
                Resolved: