-
Initiative
-
Resolution: Done
-
Undefined
-
None
-
None
-
None
-
Future Sustainability
-
None
-
False
-
-
False
-
None
-
None
-
None
-
None
Feature Overview (aka. Goal Summary)
i am using multi-project quota(ClusterResourceQuota) i see one of the small issue in it,
for ex: # Created quota with 100G
- now created one pvc with size 50G and name as test
- again if i try to create the pvc again with the same name test and size as 50G, it will throw an error as pvc with a name already exists. after this, the quota is updated the status with 100G usage
- and it takes some time to refresh it.
I also would like to know. at what interval does the default reconciliation is happen is there any way to force quota to consider only successfully created pvs
Goals (aka. expected user outcomes)
I am expecting here only the successful creation of PVC should be considered by the quota
Requirements (aka. Acceptance Criteria):
A list of specific needs or objectives that a feature must deliver in order to be considered complete. Be sure to include nonfunctional requirements such as security, reliability, performance, maintainability, scalability, usability, etc. Initial completion during Refinement status.
<enter general Feature acceptance here>
Anyone reviewing this Feature needs to know which deployment configurations that the Feature will apply to (or not) once it's been completed. Describe specific needs (or indicate N/A) for each of the following deployment scenarios. For specific configurations that are out-of-scope for a given release, ensure you provide the OCPSTRAT (for the future to be supported configuration) as well.
Deployment considerations | List applicable specific needs (N/A = not applicable) |
Self-managed, managed, or both | Y |
Classic (standalone cluster) | |
Hosted control planes | Y |
Multi node, Compact (three node), or Single node (SNO), or all | |
Connected / Restricted Network | |
Architectures, e.g. x86_x64, ARM (aarch64), IBM Power (ppc64le), and IBM Z (s390x) | |
Operator compatibility | |
Backport needed (list applicable versions) | |
UI need (e.g. OpenShift Console, dynamic plugin, OCM) | |
Other (please specify) |
Use Cases (Optional):
Include use case diagrams, main success scenarios, alternative flow scenarios. Initial completion during Refinement status.
<your text here>
Questions to Answer (Optional):
Include a list of refinement / architectural questions that may need to be answered before coding can begin. Initial completion during Refinement status.
<your text here>
Out of Scope
High-level list of items that are out of scope. Initial completion during Refinement status.
<your text here>
Background
Provide any additional context is needed to frame the feature. Initial completion during Refinement status.
<your text here>
Customer Considerations
Provide any additional customer-specific considerations that must be made when designing and delivering the Feature. Initial completion during Refinement status.
<your text here>
Documentation Considerations
Provide information that needs to be considered and planned so that documentation will meet customer needs. If the feature extends existing functionality, provide a link to its current documentation. Initial completion during Refinement status.
<your text here>
Interoperability Considerations
Which other projects, including ROSA/OSD/ARO, and versions in our portfolio does this feature impact? What interoperability test scenarios should be factored by the layered products? Initial completion during Refinement status.
<your text here>