-
Feature
-
Resolution: Unresolved
-
Undefined
-
None
-
None
-
None
-
BU Product Work
-
False
-
-
False
-
100% To Do, 0% In Progress, 0% Done
-
0
Feature Overview (aka. Goal Summary)
As a service, we need to be able to update the control plane rapidly in order to meet security and compliance requirements. This update will happen very frequently throughout the fleet. If the upgrade runs into an issue, we need to be able to get the customer back in a working state within minutes
<your text here>
Goals (aka. expected user outcomes)
Be able to roll back a cluster to a previously working state so that customer can be back to their previously working state
<your text here>
Requirements (aka. Acceptance Criteria):
The control plane can be rolled back to a previous working version without a negative impact to the workload or control plane functionality
<enter general Feature acceptance here>
Anyone reviewing this Feature needs to know which deployment configurations that the Feature will apply to (or not) once it's been completed. Describe specific needs (or indicate N/A) for each of the following deployment scenarios. For specific configurations that are out-of-scope for a given release, ensure you provide the OCPSTRAT (for the future to be supported configuration) as well.
Deployment considerations | List applicable specific needs (N/A = not applicable) |
Self-managed, managed, or both | |
Classic (standalone cluster) | |
Hosted control planes | |
Multi node, Compact (three node), or Single node (SNO), or all | |
Connected / Restricted Network | |
Architectures, e.g. x86_x64, ARM (aarch64), IBM Power (ppc64le), and IBM Z (s390x) | |
Operator compatibility | |
Backport needed (list applicable versions) | |
UI need (e.g. OpenShift Console, dynamic plugin, OCM) | |
Other (please specify) |
Use Cases (Optional):
Include use case diagrams, main success scenarios, alternative flow scenarios. Initial completion during Refinement status.
<your text here>
Questions to Answer (Optional):
Include a list of refinement / architectural questions that may need to be answered before coding can begin. Initial completion during Refinement status.
<your text here>
Out of Scope
High-level list of items that are out of scope. Initial completion during Refinement status.
<your text here>
Background
Provide any additional context is needed to frame the feature. Initial completion during Refinement status.
<your text here>
Customer Considerations
Provide any additional customer-specific considerations that must be made when designing and delivering the Feature. Initial completion during Refinement status.
<your text here>
Documentation Considerations
Provide information that needs to be considered and planned so that documentation will meet customer needs. If the feature extends existing functionality, provide a link to its current documentation. Initial completion during Refinement status.
<your text here>
Interoperability Considerations
Which other projects, including ROSA/OSD/ARO, and versions in our portfolio does this feature impact? What interoperability test scenarios should be factored by the layered products? Initial completion during Refinement status.
<your text here>
- is related to
-
OTA-455 Support assisted z-stream rollbacks from 4.16+
- Closed
-
OCPSTRAT-975 Support assisted z-rollback for OCP EUS versions from 4.16+
- Closed