XMLWordPrintable

    • False
    • Hide

      None

      Show
      None
    • False
    • 100% To Do, 0% In Progress, 0% Done
    • 7
    • 0
    • 0

      Feature Overview (aka. Goal Summary)  

      Customers have requested the ability to have the ability to apply tolerations to the HCP control plane pods. This provides the flexibility to have the HCP pods scheduled to nodes with taints applied to them that are not currently tolerated by default.

      API 

      Add new field to HostedCluster. hc.Spec.Tolerations

      Tolerations   []corev1.Toleration `json:"tolerations,omitempty"` 

      Implementation

      In support/config/deployment.go, add hc.spec.tolerations from hc when generating the default config. This will cause the toleration to naturally get spread to the deployments and statefulsets.

      CLI

      Add new cli argument called –tolerations to the hcp cli tool during cluster creation. This argument should be able to be set multiple times. The syntax of the field should follow the convention set by the kubectl client tool when setting a taint on a node.

      For example, the kubectl client tool can be used to set the following taint on a node.

      kubectl taint nodes node1 key1=value1:NoSchedule

      And then the hcp cli tool should be able to add a toleration for this taint during creation with the following cli arg.

      hcp cluster create kubevirt –toleration “key1=value1:noSchedule” …

      Goals (aka. expected user outcomes)

      • Support for customer defined tolerations for HCP pods

        Requirements (aka. Acceptance Criteria):

      A list of specific needs or objectives that a feature must deliver in order to be considered complete.  Be sure to include nonfunctional requirements such as security, reliability, performance, maintainability, scalability, usability, etc.  Initial completion during Refinement status.

      <enter general Feature acceptance here>

       

      Anyone reviewing this Feature needs to know which deployment configurations that the Feature will apply to (or not) once it's been completed.  Describe specific needs (or indicate N/A) for each of the following deployment scenarios. For specific configurations that are out-of-scope for a given release, ensure you provide the OCPSTRAT (for the future to be supported configuration) as well.

      Deployment considerations List applicable specific needs (N/A = not applicable)
      Self-managed, managed, or both  
      Classic (standalone cluster)  
      Hosted control planes  
      Multi node, Compact (three node), or Single node (SNO), or all  
      Connected / Restricted Network  
      Architectures, e.g. x86_x64, ARM (aarch64), IBM Power (ppc64le), and IBM Z (s390x)  
      Operator compatibility  
      Backport needed (list applicable versions)  
      UI need (e.g. OpenShift Console, dynamic plugin, OCM)  
      Other (please specify)  

      Use Cases (Optional):

      Include use case diagrams, main success scenarios, alternative flow scenarios.  Initial completion during Refinement status.

      <your text here>

      Questions to Answer (Optional):

      Include a list of refinement / architectural questions that may need to be answered before coding can begin.  Initial completion during Refinement status.

      <your text here>

      Out of Scope

      High-level list of items that are out of scope.  Initial completion during Refinement status.

      <your text here>

      Background

      Provide any additional context is needed to frame the feature.  Initial completion during Refinement status.

      <your text here>

      Customer Considerations

      Provide any additional customer-specific considerations that must be made when designing and delivering the Feature.  Initial completion during Refinement status.

      <your text here>

      Documentation Considerations

      Provide information that needs to be considered and planned so that documentation will meet customer needs.  If the feature extends existing functionality, provide a link to its current documentation. Initial completion during Refinement status.

      <your text here>

      Interoperability Considerations

      Which other projects, including ROSA/OSD/ARO, and versions in our portfolio does this feature impact?  What interoperability test scenarios should be factored by the layered products?  Initial completion during Refinement status.

      <your text here>

            smullick@redhat.com Sachin Mullick
            rhn-engineering-dvossel David Vossel
            Catherine Tomasko Catherine Tomasko
            Votes:
            0 Vote for this issue
            Watchers:
            5 Start watching this issue

              Created:
              Updated: