-
Story
-
Resolution: Done
-
Major
-
None
-
None
-
BU Product Work
-
3
-
False
-
None
-
False
-
OCPSTRAT-384 - Control Plane Machine Set Testing
-
CLOUD Sprint 228
Background
We want to check that, if a Machine is not up to date, that the OnDelete strategy does not replace the Machine until the deletion timetsamp is set.
Use master-2 so that we replace a secondary machine after the rolling update test.
Steps
- Create a test that:
- Checks a CPMS exists and is active
- Change the CPMS strategy to OnDelete
- Modify master-2 to need an update
- Check that the CPMS status needs an update
Note, this will preceed a test that then removes the Machine, they will be in an ordered container together.
Stakeholders
- Cluster Infra
Definition of Done
- Test is running in an ordered container checking that the Machine does not get deleted when the spec differs
- Docs
- <Add docs requirements for this card>
- Testing
- <Explain testing that will be added>
- is blocked by
-
OCPCLOUD-1735 Bootstrap E2E test suite
- Closed
- links to