Uploaded image for project: 'OpenShift Bugs'
  1. OpenShift Bugs
  2. OCPBUGS-58359

Component Readiness: [Cluster Autoscaler] [Machines] test regressed

XMLWordPrintable

    • Quality / Stability / Reliability
    • False
    • Hide

      None

      Show
      None
    • 3
    • Important
    • None
    • None
    • None
    • Proposed
    • None
    • None
    • None
    • None
    • None
    • None
    • None
    • None

      (Feel free to update this bug's summary to be more specific.)
      Component Readiness has found a potential regression in the following test:

      [sig-cluster-lifecycle][Feature:Machines][Serial] Managed cluster should grow and decrease when scaling different machineSets simultaneously [Timeout:30m][apigroup:machine.openshift.io] [Suite:openshift/conformance/serial]

      Significant regression detected.
      Fishers Exact probability of a regression: 99.93%.
      Test pass rate dropped from 97.70% to 87.50%.

      Sample (being evaluated) Release: 4.20
      Start Time: 2025-06-26T00:00:00Z
      End Time: 2025-07-03T12:00:00Z
      Success Rate: 87.50%
      Successes: 21
      Failures: 3
      Flakes: 0

      Base (historical) Release: 4.18
      Start Time: 2025-01-26T00:00:00Z
      End Time: 2025-02-25T00:00:00Z
      Success Rate: 97.70%
      Successes: 85
      Failures: 2
      Flakes: 0

      View the test details report for additional context.

      This test appears to fail enough (albeit relatively rarely) on vsphere to trip component readiness. Over the last week we're at about 5% fail rate. Prior week was about 23% fail rate.

              mimccune@redhat.com Michael McCune
              rhn-engineering-dgoodwin Devan Goodwin
              None
              None
              Paul Rozehnal Paul Rozehnal
              None
              Votes:
              0 Vote for this issue
              Watchers:
              4 Start watching this issue

                Created:
                Updated:
                Resolved: