Description of problem:
HCM has many customers using the limited-live migration to move from SDN to OVN. This process claims no pre-requisites around removing webhooks etc, however we have seen dozens hang on draining nodes with a webhook that has started failing _during_ the migration.
Version-Release number of selected component (if applicable):
4.16.z
How reproducible:
Fairly, although we have just relied on the customer doing migrations, seeing them hang, then investigating.
Steps to Reproduce: (possibly)
1. Create a validating admission webhook for X 2. Create a workload with a PDB of minimum 1 3. Perform an SDN to OVN limited live migration
Actual results:
The migration hangs draining nodes on the webhook, which was previously available before the migration (assumption)
Expected results:
The migration progresses properly
Additional info:
I have a must-gather link I can share with whoever picks this ticket up.