-
Bug
-
Resolution: Done
-
Critical
-
None
-
4.18
-
None
-
Quality / Stability / Reliability
-
False
-
-
1
-
Moderate
-
None
-
None
-
None
-
None
-
T&PS 2025 #2, T&PS 2025 #3
-
2
-
None
-
None
-
None
-
None
-
None
-
None
-
None
Description of problem:
2 diagrams for networking, added in https://github.com/openshift/openshift-docs/pull/88622 , for the Core cluster must be updated
images/openshift-telco-core-rds-metallb-service-separation.png:
- bonded interface, BOND, should be on top of 2 PFs (PF0 and PF1) and not on the VF0 from the respective PFs
- the interface order of VLAN0 and BR-EX should be swapped(BR-EX on top of VLAN0 on top of BOND)
images/openshift-telco-core-rds-networking.png:
- bonded interface, BOND, should be on top of 2 PFs (PF0 and PF1) and not on the VF0 from the respective PFs
Version-Release number of selected component (if applicable):
4.18
How reproducible:
Steps to Reproduce:
1.
2.
3.
Actual results:
Expected results:
Additional info: