Uploaded image for project: 'OpenShift Bugs'
  1. OpenShift Bugs
  2. OCPBUGS-32760

Hypershift Operator is scheduing control plane on Deleting nodes

XMLWordPrintable

    • Icon: Bug Bug
    • Resolution: Done-Errata
    • Icon: Major Major
    • 4.16.0
    • 4.15.z
    • HyperShift
    • None
    • Important
    • No
    • Hypershift Sprint 252, Hypershift Sprint 253
    • 2
    • False
    • Hide

      None

      Show
      None

      Description of problem:

          Hypershift Operator is scheduing control plane on Deleting nodes

      Version-Release number of selected component (if applicable):

          

      How reproducible:

          

      Steps to Reproduce:

      https://web-rca.devshift.net/incident/ITN-2024-00068
          1. HO was trying to create an HCP on a node being deleted
          2. HO couldn't find the paired node 'cause it was already deleted 
        
       Forcing the removal of pending node (blocked by PDB) solves the issue  

      Actual results:

          

      Expected results:

          

      Additional info:

          

            cewong@redhat.com Cesar Wong
            sminonne@redhat.com Salvatore Dario Minonne
            Jie Zhao Jie Zhao
            Votes:
            0 Vote for this issue
            Watchers:
            5 Start watching this issue

              Created:
              Updated:
              Resolved: