Uploaded image for project: 'Network Hardware Enablement'
  1. Network Hardware Enablement
  2. NHE-109

Bluefield-2 in DPU mode: rerun flow tests

    XMLWordPrintable

Details

    • Bluefield-2 in DPU mode: Support for HWOL
    • True
    • False
    • Not Selected
    • To Do
    • 100
    • 100% 100%
    • NHE Sprint 223, NHE Sprint 224, NHE Sprint 225, NHE Sprint 227, NHE Sprint 229, NHE Sprint 230, NHE Sprint 232, NHE Sprint 233, NHE Sprint 234

    Description

      Section 5 in https://docs.google.com/document/d/1fF-Ajdzc9EDDg687FzTrX577hvY9NdK0/edit#heading=h.gjdgxs

      We need backports in 8.6 to be merged before work on testing all the flows can start.

      We need a 2-cluster design deployment. (1 arm server, 3 x86 server (2 of which have bf-2)).

       

      Defintion of done: updated spreadsheet with performance (include fw version)

      Attachments

        Issue Links

          Activity

            People

              bnemeth@redhat.com Balazs Nemeth
              bnemeth@redhat.com Balazs Nemeth
              Ying Wang Ying Wang
              NVIDIA (Mellanox) Confidential Group
              Votes:
              0 Vote for this issue
              Watchers:
              7 Start watching this issue

              Dates

                Created:
                Updated: