Uploaded image for project: 'Network Edge'
  1. Network Edge
  2. NE-2039

httpsLogFormat option for the IngressController API

XMLWordPrintable

    • Icon: Epic Epic
    • Resolution: Unresolved
    • Icon: Normal Normal
    • None
    • None
    • httpsLogFormat option for the IngressController API
    • Product / Portfolio Work
    • OCPSTRAT-2003httpslogformat Option for the Ingress Controller
    • 71% To Do, 14% In Progress, 14% Done
    • False
    • Hide

      None

      Show
      None
    • False
    • Green
    • M
    • 13
    • 0

      Epic Goal

      Add tcpLogFormat and httpsLogFormat options to the IngressController API.

      Why is this important?

      The existing httpLogFormat option doesn't allow logging TLS-specific options for HTTPS connections. A specific httpsLogFormat option is required for this purpose. A tcpLogFormat provides a consistent way to configure log messages for TLS connections prior to TLS termination.

      Planning Done Checklist

      The following items must be completed on the Epic prior to moving the Epic from Planning to the ToDo status

      • Priority is set by engineering
      • Epic must be Linked to a Parent Feature
      • Target version must be set
      • Assignee must be set
      • Enhancement Proposal is Implementable
      • No outstanding questions about major work breakdown
      • Are all Stakeholders known? Have they all been notified about this item?
      • Does this epic affect SD? Have they been notified? (View plan definition for current suggested assignee)

      Acceptance Criteria

      • CI - MUST be running successfully with tests automated
      • Release Technical Enablement - Provide necessary release enablement
        details and documents.

      ...

      Dependencies (internal and external)

      None.

      ...

      Previous Work (Optional)

      1. NE-280

      Open questions

      1. …

      Done Checklist

      • CI - CI is running, tests are automated and merged.
      • Release Enablement <link to Feature Enablement Presentation>
      • DEV - Upstream code and tests merged: <link to meaningful PR or GitHub Issue>
      • DEV - Upstream documentation merged: <link to meaningful PR or GitHub Issue>
      • DEV - Downstream build attached to advisory: <link to errata>
      • QE - Test plans in Polarion: <link or reference to Polarion>
      • QE - Automated tests merged: <link or reference to automated tests>
      • DOC - Downstream documentation merged: <link to meaningful PR>

              rhn-engineering-rohara Ryan O'Hara
              mmasters1@redhat.com Miciah Masters
              None
              Shudi Li Shudi Li
              None
              Votes:
              0 Vote for this issue
              Watchers:
              5 Start watching this issue

                Created:
                Updated: