-
Epic
-
Resolution: Done
-
Major
-
None
-
None
-
PowerVM and PowerVS Operators and Operands built on rhel9
-
False
-
None
-
False
-
Not Selected
-
NEW
-
To Do
-
ppc64le
-
NEW
-
S
Epic Goal
- PowerVM and PowerVS Operators and Operands built on rhel9
- Enable the following drivers with rhel9 base images which are FIPS compliant
- https://github.com/openshift/ibm-powervs-block-csi-driver
- https://github.com/openshift/ibm-powervs-block-csi-driver-operator
- https://github.com/openshift/machine-api-provider-powervs
- https://github.com/openshift/cloud-provider-powervs
We may also want to check any upstream, adjacent, or supplementary repos: - https://github.com/kubernetes-sigs/ibm-powervs-block-csi-driver ?
- powervm-rmc
- nfs-provisioner? we use in some deployments for upi
- Enable the following drivers with rhel9 base images which are FIPS compliant
- Power VS image FIPS support (ubi vs. rhel-els) refer to MULTIARCH DEV CALL
2024-05-02 - Recent update to Operator
As a part of CVP-4057 [0] initiative, CVP extends the Operator Infrastructure Feature Test [1] to not only validate the presence/absence of all infrastructure annotations [2] with “true”/”false” values, but for the "features.operators.openshift.io/disconnected" and "features.operators.openshift.io/fips-compliant" annotations, also check if those values are set to “true”.
Confirm....
Why is this important?
- To be enabled for FIPS we need to base on RHEL9
Scenarios
1. …
Acceptance Criteria
- (Enter a list of Acceptance Criteria unique to the Epic)
- …
Dependencies (internal and external)
1. …
Previous Work (Optional):
1. …
Open questions::
1. …
Done Checklist
- CI - For new features (non-enablement), existing Multi-Arch CI jobs are not broken by the Epic
- Release Enablement: <link to Feature Enablement Presentation>
- DEV - Upstream code and tests merged: <link to meaningful PR orf GitHub Issue>
- DEV - Upstream documentation merged: <link to meaningful PR or GitHub Issue>
- DEV - If the Epic is adding a new stream, downstream build attached to advisory: <link to errata>
- QE - Test plans in Test Plan tracking software (e.g. Polarion, RQM, etc.): <link or reference to the Test Plan>
- QE - Automated tests merged: <link or reference to automated tests>
- QE - QE to verify documentation when testing
- DOC - Downstream documentation merged: <link to meaningful PR>
- All the stories, tasks, sub-tasks and bugs that belong to this epic need to have been completed and indicated by a status of 'Done'.