Uploaded image for project: 'Multiple Architecture Enablement'
  1. Multiple Architecture Enablement
  2. MULTIARCH-3772

Epic breakdown for HyperShift Hosted Control Plane Phase 1 GA (x86 CP, P or Z Compute)

XMLWordPrintable

    • Icon: Task Task
    • Resolution: Done
    • Icon: Normal Normal
    • None
    • None
    • None
    • None
    • Strategic Product Work
    • False
    • None
    • False
    • NEW
    • OCPSTRAT-389 - [GA] Support x86 control-plane with Z data-plane for HyperShift on BM
    • ppc64le, s390x
    • NEW

      Related Teams
      Hypershift

      Acceptance Criteria

      • A copy of the 4.15 epic breakdown template is made and renamed to indicate which feature it's for
      • Set up a meeting with the stakeholder teams and contributors and determine stories that are needed to deliver this epic
      • Stories filed to Jira for all of the next steps according to these instructions
      • A finalized copy of the epic breakdown document for the feature is saved to the shared directory for epic breakdown for 4.15

              jfreudbe@redhat.com Jeremy Freudberg (Inactive)
              jpoulin Jeremy Poulin
              Dharaneeshwaran Ravichandran, Vikas Singh
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Created:
                Updated:
                Resolved: