-
Task
-
Resolution: Done
-
Normal
-
None
-
None
-
Quality / Stability / Reliability
-
False
-
None
-
False
-
1
-
None
-
None
-
Sprint 13: 05/24 - 06/12
As the Multi-Arch engineer, I would like to provide the QE teams the location of the SBO, so that they can retrieve the operator to conduct testing.
Acceptance Criteria:
- Research has been done on the location of the SBO
- Location has been provided to the P&Z QE leads via document, comment or email
SME: Luvella McFadden (P QE), Wolfgang Voesch (Z QE), Yaakov Selkowitz (MA)