Uploaded image for project: 'Migration Toolkit for Virtualization'
  1. Migration Toolkit for Virtualization
  2. MTV-4148

The vSphere provider status changed to "Connection Failed" from time to time

XMLWordPrintable

    • Icon: Bug Bug
    • Resolution: Unresolved
    • Icon: Major Major
    • None
    • 2.10.2
    • Controller
    • Quality / Stability / Reliability
    • False
    • Hide

      None

      Show
      None
    • False

      Description of problem:

      The vSphere provider status changed to "Connection Failed" from time to time,  several minutes later, the provider status changed to "Ready" again, I think the network is connected all the time, more details in attached video: "Screencast From 2025-12-17 13-13-35.mp4"
      [Notice: This is happen when the network is slow]

      Version-Release number of selected component (if applicable):

      MTV 2.10.2-7 with CNV4.20.3

      How reproducible:

      60%

      Steps to Reproduce:

      1) Create a vCenter provider: v7-us with certificate validation.

      2) Create a warm migration plan: warm-win2019-test to migrate VM: mtv-feature-WIN2019_multi_IPs from v7-us provider to OCP cluster.

      3) During the plan execution, get the error message: "The plan is not ready", which is caused by the provider status changed to "Connection Failed", several minutes later, the provider status changed to "Ready" again, I think the network is connected all the time, more details in attached video: "Screencast From 2025-12-17 13-13-35.mp4"

      Actual results:

      In step3, the provider status changed to "Connection Failed" from time to time

      Expected results:

      In step2: the provider status is not changed.

      Additional info:

       

              gcheresh@redhat.com Genadi Chereshnya
              chhu@redhat.com Chenli Hu
              Votes:
              0 Vote for this issue
              Watchers:
              5 Start watching this issue

                Created:
                Updated: