Uploaded image for project: 'Migration Toolkit for Virtualization'
  1. Migration Toolkit for Virtualization
  2. MTV-2702

Migration plan failed and conversion pod is not created

XMLWordPrintable

    • Icon: Bug Bug
    • Resolution: Unresolved
    • Icon: Normal Normal
    • 2.9.z
    • 2.9.0
    • Controller

      Description of problem:

      Try to cold migrate VM from vCenter to OCP cluster, the migration plan failed without any error message and the conversion pod is not created

      After debugging, the root cause is that, in target OCP cluster, another VM with interface with the same mac address, how about sharing the error message in the failed plan, as the user will confused by why the plan is failed, and why the conversion pod is not created, they can't find useful information in forklift-controller pod log

      Version-Release number of selected component (if applicable):

      MTV 2.9.0 (forklift-fbc-prod-v418:on-pr-16546d253dda4fc8d8b838f0703040f30a985cf0) with CNV 4.18.7 (IIB: 983760)

      How reproducible:

      100%

      Steps to Reproduce:

      1) Cold migrate VM: mtv-function-rhel7-9-staticips with 4 interfaces from vCenter 7 without certificate verification to OCP cluster with preserve static ip, the plan failed in ImageConversion phase, no conversion pod is created. And user can't find useful information in controller pod log: forklift-controller-5bbb448f79-w4gcb-main.log

      Actual results:

      Step1: The plan is failed without error message

      Expected results:

      Step1: The failed plan show the error message

              rh-ee-ehazan Elad Hazan
              chhu@redhat.com Chenli Hu
              Votes:
              0 Vote for this issue
              Watchers:
              6 Start watching this issue

                Created:
                Updated: