Description of problem:
Migrating an app in MTRHO is stuck on the transfer-pvc-0 stage, the last successful log printed is “Generating new certificate” then it fails/ gets stuck.
So far, two different behaviors were observed after that log was printed. One of them is rsync pod getting stuck on not ready status
|
The second one is an error showing that the certificate secret already exists.
|
Therefore, it is believed that those issues are related to the generation of the certificate, and/or the certificate secret
Version-Release number of selected component (if applicable):
Source GCP 3.11
Target GCP 4.11
How reproducible:
Often
Steps to Reproduce:
- Create a namespace in the source cluster and deploy any stateful app in it.
- Import the app in a namespace in the target cluster.
Actual results:
The migration fails on transferring the pvc.
Expected results:
The migration should be completed with no errors
Additional info:
$oc logs -n django rsync-server-e4728f444b -c rsync
2022/07/19 06:16:48 [8] rsyncd version 3.1.3 starting, listening on port 8080
2022/07/19 06:17:14 [62] connect from localhost (::1)
2022/07/19 06:17:14 [63] connect from localhost (::1)