Uploaded image for project: 'Migration Toolkit for Applications'
  1. Migration Toolkit for Applications
  2. MTA-912

in migration waves - after applying wrong dates, correcting the dates does not remove the error message

XMLWordPrintable

    • Icon: Bug Bug
    • Resolution: Cannot Reproduce
    • Icon: Normal Normal
    • MTA 6.2.0
    • MTA 6.2.0
    • None
    • None
    • False
    • Hide

      None

      Show
      None
    • False
    • No

      Description of problem:

      in migration waves - after editing a migration wave and applying wrong dates then correcting the dates does not remove the error message "
      Start date must be before end date"

       

      Version-Release number of selected component (if applicable): 

       

      How reproducible: always

       

      Steps to Reproduce:
      1.Navigate to migration waves tab
      2.Edit a migration wave
      3.Apply Start date after the end date - error message should be shown

      4.apply correct end date (after the start date)

      5. the message still present 

      Actual results:

      the error message is still shown even after correcting the end date

       

      Expected results:

      the error message should be gone when correcting the end date

       

      Additional info:

              ibolton@redhat.com Ian Bolton
              nhamza12 Neil Hamza
              Neil Hamza Neil Hamza
              Votes:
              0 Vote for this issue
              Watchers:
              3 Start watching this issue

                Created:
                Updated:
                Resolved: