Uploaded image for project: 'Migration Toolkit for Applications'
  1. Migration Toolkit for Applications
  2. MTA-1420

[Analysis] Next button is enabled before the binary upload is finished

XMLWordPrintable

    • Icon: Bug Bug
    • Resolution: Done
    • Icon: Blocker Blocker
    • MTA 7.0.0
    • MTA 7.0.0
    • None
    • Quality / Stability / Reliability
    • False
    • Hide

      None

      Show
      None
    • False
    • No

      Description of problem:

      When conducting an analysis by uploading a binary file, the 'Next' button becomes enabled as soon as the file upload begins.

      If the user clicks it before the upload is finished, the analysis starts without an actual application uploaded, resulting in a failed analysis

      Version-Release number of selected component (if applicable): MTA 7.0.0-18 

      How reproducible: Always 

      Steps to Reproduce:
      1. Create an application and open the analysis wizard on it
      2. Select "Upload binary anaysis" and select a binary file

      Actual results:

      The "Next" button is enabled as soon as the upload begins.

      Expected results:

      The "Next" button shouldn't be enabled until the upload has finished.

      Additional info:

      Video with steps of reproduction and cconsole output: https://jam.dev/c/f8037b76-438f-475b-83f1-61ff954fdc51

              ibolton@redhat.com Ian Bolton
              rh-ee-abrugaro Alejandro Brugarolas
              Alejandro Brugarolas Alejandro Brugarolas
              Votes:
              0 Vote for this issue
              Watchers:
              5 Start watching this issue

                Created:
                Updated:
                Resolved: