Uploaded image for project: 'Red Hat OpenBridge'
  1. Red Hat OpenBridge
  2. MGDOBR-1267

Update Control Plane with ManagedBridge status

XMLWordPrintable

    • MGDOBR - Sprint 229

      Issue Description: 

      The data plane should push updates for the status sub-resource of the ManagedBridge CR back to the Control Plane

      Acceptance Criteria: 

      • The Data Plane pushes details of the status sub-resource for the ManagedBridge back to the Control Plane when there are changes made to it or on a timed loop

      Additional Information

      • Determine if this also needs to be done on a timed loop to avoid any loss of update

              vajain Vaibhav Jain
              rblake@redhat.com Rob Blake
              Jiri Petrlik Jiri Petrlik
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

                Created:
                Updated:
                Resolved: