When a migration plan is executed and finished, all migration logs are presented in a single page at once.
See the screenshot, the length of the whole log can be assessed from the size of scrollbar on the right. The screenshot was taken from a migration that was run on 15 instances only.
This proves problematic considering possible high number of instances to migrate at once.