Uploaded image for project: 'jBPM'
  1. jBPM
  2. JBPM-8226

Stunner- Unexpected drag behavior on control points

XMLWordPrintable

    • Icon: Bug Bug
    • Resolution: Unresolved
    • Icon: Minor Minor
    • None
    • 7.18.0.Final
    • Designer
    • NEW
    • NEW
    • Hide

      Attaching a process (aris-resolution-v2.bpmn) where this issue is reproducible, once moving the task named "Dar ubicacion en CPD".

      Show
      Attaching a process ( aris-resolution-v2.bpmn ) where this issue is reproducible, once moving the task named "Dar ubicacion en CPD".

      There exist some strange behavior on the connector's control points.

      Consider 3 tasks connected by sequence flows, as [Task1] --> [Task2] --> [Task3]

      It's expected than when moving Task2, the control points for both sequence flows are not updated, only the source/target connections must be updated. But sometimes, it also updates other control points, rather than the connections, when moving Task2.

      See steps to reproduce for an example.

              romartin@redhat.com Roger Martinez
              romartin@redhat.com Roger Martinez
              Votes:
              0 Vote for this issue
              Watchers:
              3 Start watching this issue

                Created:
                Updated: